Worker Safety

Email sent to Covanta Representative Attorney Raymond Carey on Oct 3, 2008 at 2:56 PM

Ray,

The below is a new list of additional safety concerns at your Semass facility. This list supplements the list we provided at the bargaining table on September 25, and in our follow-up email September 26. As we stated at the bargaining table we will ask our members to provide detailed safety issues for your immediate attention. Please be advised we continue to request our members bring safety issues directly to your management. However, as you can see they are reluctant to do so.

We have asked all our members to complete a workplace hazard reporting form. Please advise your managers we have asked our members to provide completed forms to their supervisors. Forms delivered to the Union will be sent to your management as soon as possible.

  1. Open Electrical box (ELL) exposed wires below #2 Soot Blower Root Valve
  2. Damaged Fire Hose Reel 9th Floor BLR 3 south
  3. #3 SDA Penthouse floor covered in line slurry
  4. Damaged conduit BLR 3 Atomizer exposed wires
  5. Damaged conduit BLR 3-2 Soot Blower exposed wires
  6. #2 SDA Penthouse open junction box exposed wires
  7. 2-13 soot blower damaged conduit exposed wires
  8. 7 ½ floor between BLR's 1&2 wash hoes blocking fire extinguishers
  9. Damaged hose reel 6th Floor near 14 head End
  10. String lights hanging above BLR 3 drag chains both plugs cut off
  11. Planking above BLR 2 drag chains not fastened down
  12. 3rd floor BLR 3 air heater area, no lighting, floor covered with material, tripping hazard
  13. BLR 3 south catwalk, steel on deck, trip hazard
  14. BLS 1, 2, 3 down chute areas, hoses, poke rods, and hooks all over deck, tripping hazards.
  15. 2nd floor ash clean off area not accessible, used as storage area
  16. Grate level, hoses, and poke rods all over deck
  17. Fire extinguishers in boiler house not inspected
  18. 1-20 Q.T. No splash curtain at drain valve area
  19. Siding missing from boiler, different areas most notably BLR slope casing, falling insulation
  20. Grate clip crates on 2nd floor are busting out at the corner, ready to spill out, over filled, others are damaged, need to remove from service.
If you have any questions please call me.
 

Email sent to Covanta Representative Attorney Raymond Carey on Sep 26, 2008 at 8:44 AM

Ray, as a follow up to our discussion yesterday and the list we provided Covanta of safety issues at its SEMASS facility.  We provided the below supplement to our written list of safety concerns.

  • Workers being required to switch out high voltage switch gear (MCC's) while standing in inches of boiler wash water.
  • SEMASS lacks an adequate heat stress program.  Workers are required to perform heavy work, sometimes in protective clothing, in area of the facility with high ambient air temperatures.  The currently workers are free to leave the area when they feel it necessary.  The industry standard is to assign a maximum stay time, and subsequent cooling off period, in conjunction with workers self determination.
  • July 10, 2008 we requested coveralls with snapped fronts be replaced with zippered fronts to reduce body contact with rubbish.  Plant Manager Davis suggested workers use duct tape to seal the coveralls fronts.  That idea was rejected by Chief Steward Fabich, and we continue to demand zippered coveralls.
  • Covanta stopped routine cleaning under 6 & 4 conveyors more than a year ago which has resulted in large piles of debris accumulation.
  • 11 Conveyors trash is piled 6-8 feet high, this despite VAC truck available to remove piles of debris Covanta.
  • Piles of trash/debris allowed accumulating in shredder room.
  • Piles of hot ash in "back end"
  • Entire boiler building is covered in ash residue.  Everything touched moves ash into air (airborne).
  • Standard Operating Procedures have changed since VPP inception.  These changes have reduced safety.
  • Ash load-out paddles require maintenance which has not been performed, which results in large amounts of ash release to environment, and work area.
At our next meeting would like to hear from the Company concerning part 6 of our proposal, Safety, and Union proposed articles 70 and 71.  In light of the withdraw of Company proposal of August 14 we are very interested in your new prospective.
 


Newsflash

Interim Agreements

Overtime
Maintenance Schedule
Benefits Vote Results

Tentative Agreements

Articles Tentatively Agreed June 10, 11, 2009
Articles Tentatively Agreed July 1, 2, 2009

Letters

President Sullivan to CEO Orlando
HR Anechiarico reply
President Sullivan to Anechiarico
Mark Davis VPP June 4 2009
BA Leonardi Safety June 4 2009
Fact Sheet

Notices

July 10, 2008 Bargaining Update
July 16, 2008 Meeting Notice
July 21, 2008 Bargaining Update
August 1, 2008 Bargaining Update
August 27, 2008 Meeting Notice
August 28, 2008 Golf Notice
September 8, 2008 Bargaining Update
September 17, 2008 Bargaining Update
September 23, 2008 Meeting Notice
September 24, 2008 Bargaining Update
October 1, 2008 Bargaining Update
October 3, 2008 Local 369 letter
October 6, 2008 Local 369 letter
October 14, 2008 Meeting Notice
October 15, 2008 Bargaining Update
December 28, 2008 Meeting Notice
2008-2009 Objection Plan
January 25, 2009 Meeting Notice
February 9, 2009 Response Davis Memo
March 5, 2009 Response Davis Memo
May 4, 2009 Response Davis Memo
May 4, 2009 Clown memo
May 24, 2009 Meeting Notice
June 1, 2009 NLRB COMPLAINT
November 1, 2009 Meeting Notice
November 21, 2009 10J

Union Support

Resolution for fair treatment of employees of Covanta

Union Proposals

July 16 Local 369 Contract Proposal
August 14 Local 369 Contract Proposal
September 17 Local 369 Contract Proposal
October 16 Local 369 Contract Proposal
October 23 Local 369 Contract Proposal
November 12 Local 369 Contract Proposal
November 19 Local 369 Contract Proposal
December 11 Local 369 Contract Proposal
December 17 Local 369 Contract Proposal
January 20 Local 369 Contract Proposal
February 18 Local 369 Contract Proposal
February 25 Local 369 Contract Proposal
February 26 Local 369 Contract Proposal
March 3 Local 369 Contract Proposal
March 11 Local 369 Contract Proposal
March  25 Local 369 Contract Proposal
April  21 Local 369 Contract Proposal
April 23 Local 369 Contract Proposal
May 20 Local 369 Contract Proposal
May 21 Local 369 Contract Proposal
July 8 Local 369 Contract Proposal
August 5 Local 369 Bonus Proposal
August 6 Local 369 Contract Proposal
August 27 Local 369 Bonus Proposal
August 27 Local 369 Contract Proposal
February 3, 2010 Local 369 contract proposal

Covanta Proposals

September 17 Covanta Contract Proposal
October 16 Regressive Management Rights
October 16 other proposals
October 22 proposal
November 12 proposal
November 19 proposal
December 11 proposal
December 17 proposal-1
December 17 proposal-2
December 17 proposal-3
February 26 proposal-1
February 26 proposal-2
February 26 proposal-3
April 1 proposal
April 23 proposal
April 30 proposal-1
April 30 proposal-2
April 30 proposal-3
June 30 Bonus Proposal
June 30 Bonus Info
July 1 proposal
August 4 Bonus proposal
August 4 MOA ULP's
August 20 proposal
August 20 Bonus proposal

Covanta Proposal Wages

December 18 Wages
August 4 wage proposal

Covanta Proposal Benefits

December 18 Proposed Benefit Contributions
December 18 Proposed BCBS
December 18 Proposed Prescription
December 18 Proposed Dental & FSA
December 18 Proposed Vision
December 18 Proposed Life
December 18 Proposed STD & EAP

Covanta Withdrawn Proposals

Withdrawn September 25

Covanta Notices

September 15 Mark Davis Memo
September 18 Mark Davis Memo
September 17 Covanta bargaining notes
September 30 Covanta Letter
October 2 Mark Davis Memo
October 16 Mark Davis Memo
February 9 Mark Davis Memo
February 17 Mark Davis Memo
March 3  Mark Davis Memo
April 30-1  Mark Davis Memo
April 30-2  Mark Davis Memo
May 1  Mark Davis Memo
May 5 Mark Davis Memo

May 7 Mark Davis Memo
May 21 Mark Davis Memo1
May 21 Mark Davis Memo2
July 22 Mark Davis Memo
July 28 Mark Davis Memo
July 28 Tony Orlando Memo
November 24 Davis 10J Memo

Special Notices

Press Release September 8, 2008
Press Release February 16, 2009
Press Release May 21, 2009
Press Release June 1, 2009
Press Release July 17, 2009

Unfair Labor Charges

September 4
October 7
October 16
Complaint Issues May 21, 2009

SEMASS Stewards

Chief Steward

Gerry Fabich

Plant Stewards

Phil Canedy

Hugh Cameron

Dennis Gallant

Michael Keogh

Bill Lopes

Carver Landfill Steward

Ed Pierce

Local 369 Covanta SEMASS, Powered by Joomla! and designed by SiteGround web hosting